logo
Home ProductsCNP Mechanical Seal

water pump TD central air conditioning pipeline circulating water

Certification
China YUEMI certification
China YUEMI certification
Customer Reviews
The product is exquisitely crafted and the logistics time is fast. The customer service attitude is worth praising. We will continue to purchase if needed next time.

—— Zongla Weimeng

This was a very pleasant collaboration, and the seller has strong product expertise. The delivery time is very fast. A company worth recommending.

—— Alexander Kovich

The merchant responded very enthusiastically and quickly. My device was leaking and could not function properly. Please take a picture of the product and send it to customer service, who will immediately help me accurately determine the product model.

—— Williams

A mechanical seal company that frequently cooperates with, and the company has a complete range of goods. The quality can completely replace the original seal, and the price is not high. The service attitude is very good. Worth recommending

—— selma neves

I'm Online Chat Now

water pump TD central air conditioning pipeline circulating water

water pump TD central air conditioning pipeline circulating water
water pump TD central air conditioning pipeline circulating water water pump TD central air conditioning pipeline circulating water water pump TD central air conditioning pipeline circulating water water pump TD central air conditioning pipeline circulating water

Large Image :  water pump TD central air conditioning pipeline circulating water

Product Details:
Place of Origin: Guangzhou, China
Brand Name: YUE MI
Certification: ISO SGS
Model Number: TD-32mm TD-40mm
Payment & Shipping Terms:
Minimum Order Quantity: 1/PCS
Price: US $ 16.8~30.8/PCS
Packaging Details: Details Carton
Delivery Time: 2 word days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 1000/Set/Month

water pump TD central air conditioning pipeline circulating water

Description
Traemark: YUEMI Pump: TD Pump
Function: Sewage Pump Usage: Standard
Shaft Diameter: TD-32mm TD-40mm Type: Balanced
Highlight:

TD-32 CNP Mechanical Seal

,

TD-40 CNP Mechanical Seal

,

TD-32 mechanical seal pompa cnp

TD Series Mechanical Seals for Centrifugal Pipe Circulating Water Pumps
water pump TD central air conditioning pipeline circulating water 0 water pump TD central air conditioning pipeline circulating water 1 water pump TD central air conditioning pipeline circulating water 2 water pump TD central air conditioning pipeline circulating water 3
Product Specifications
Mechanical Seal Details
Name Custom Mechanical Seal Type Special for TD Pump
Model TD Pump Use
Size 28, 32, 40
Application Pump
Material CA/CE/SiC/TC/NBR/EPDM/V/S.S/SUS304/SUS316
Certificate ISO9001, CQC, SGS, CNAS
Technical Parameters
Temperature -30℃ ~ +200℃
Pressure ≤ 1.2 MPa
Speed ≤ 10 m/s
Medium Sewage
Material Composition
Rotary Ring SiC/VIT
Stationary Ring SiC/VIT
Spring SUS304/SUS316
Stationary Seat SUS304/SUS316
Secondary Seal FKM/EPDM
Rotary Ring Holder SUS304/SUS316
Installation Preparation
  • Shaft Outside Diameter is within tolerance ±0.05mm
  • Shaft run out < 0.1mm
  • Shaft end float < 0.13mm
  • No sharp edges on the shaft over the O-ring
Important Note: During installation, do not scratch or damage the O-ring. If anything is damaged, please contact us to replace with a new one.
Installation Instructions
The full set of cartridge seal is cleaned and exactly passed leakage examination before sale. To avoid damage, do not disassemble and clean the parts again before fixing.
The fitting allowance between the seal and shaft is dl h6 0.8, and there should be leading-in edge at the end of shaft. The outside diameter of shaft at the position of screw should be 01 0.2mm smaller, resisting the screw over-tighten. Lubricate the shaft with oil.
Place the cartridge seal into the pump chamber, then:
  • Tighten four screw bolts of flanges, ensuring the medium leading in hole "G" at the top position
  • Tighten four set screws and position the shaft sleeve on the shaft
  • Remove four gauge plates. Please keep them as they will be used in future installation and disassembly
  • Connect the medium lead-in pipe with hole "G" to flush away the friction heat and flush the seal chamber when pump is running
Final Check: After complete installation, turn the shaft by hand to check for rotation. If the shaft could not rotate smoothly, the seal has been improperly installed.
water pump TD central air conditioning pipeline circulating water 4
We would like to sincerely cooperate with clients to supply high quality products and service. We believe in establishing a long-term cooperative relationship is the key to success.
water pump TD central air conditioning pipeline circulating water 5 water pump TD central air conditioning pipeline circulating water 6

Contact Details
YUEMI

Contact Person: ZENG

Tel: +8617620005542

Send your inquiry directly to us (0 / 3000)